Heavy Duty Long Leadclip w/Pins & Tailrubber
A safe lead clip system for use with extremely heavy leads ideal for big river fishing
• Designed to release the lead should it become snagged
• For use with size 8 swivel
• The metal arm reduces twist, releases easier and is stronger for bigger leads
Item No. | Pcs |
---|---|
49889 | 10 |